Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

(b) A soil sample was taken from a site of a proposed borrow pits and sent to the UTHM laboratory for a Standard Proctor

Post by answerhappygod »

B A Soil Sample Was Taken From A Site Of A Proposed Borrow Pits And Sent To The Uthm Laboratory For A Standard Proctor 1
B A Soil Sample Was Taken From A Site Of A Proposed Borrow Pits And Sent To The Uthm Laboratory For A Standard Proctor 1 (75.79 KiB) Viewed 8 times
(b) A soil sample was taken from a site of a proposed borrow pits and sent to the UTHM laboratory for a Standard Proctor test. Given the volume of proctor mold is 943.3cm and the results of the test are as recorded in Table Q2. (i) ) From the data given, examine the appropriate method of analysis to determine the compaction parameter. Discuss the moisture range permitted from your investigation, if contractor must achieve 95% relative compaction. (ii) A field density test for the soil describe in Q2 obtained the moisture content 10.5% and moist density 1705kg/m². Determine the relative compaction
Table Q2: Result of Standard Proctor Test Moisture content Mass of wet soil in the mold (kg) (%) 1.68 1.71 1.77 1.83 1.86 1.88 1.87 1.85 9.9 10.6 12.1 13.8 15.1 17.4 19.4 21.2