- Wurde Wat With Problem 5 20 Points For A Roadway Reconstruction Project It Was Determined That Majority Of The Subgra 1 (74.71 KiB) Viewed 10 times
wurde wat with Problem 5 (20 points) For a roadway reconstruction project, it was determined that majority of the subgra
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
wurde wat with Problem 5 (20 points) For a roadway reconstruction project, it was determined that majority of the subgra
wurde wat with Problem 5 (20 points) For a roadway reconstruction project, it was determined that majority of the subgrade soils have PI values ranging 41 to 53 and percent passing No.40 sieve ranging from 50% to 60%.