(b) A low-rise building is to be built in a site having a compressible dry soil up to a depth of 5 m. Assuming that you

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

(b) A low-rise building is to be built in a site having a compressible dry soil up to a depth of 5 m. Assuming that you

Post by answerhappygod »

B A Low Rise Building Is To Be Built In A Site Having A Compressible Dry Soil Up To A Depth Of 5 M Assuming That You 1
B A Low Rise Building Is To Be Built In A Site Having A Compressible Dry Soil Up To A Depth Of 5 M Assuming That You 1 (23.41 KiB) Viewed 8 times
(b) A low-rise building is to be built in a site having a compressible dry soil up to a depth of 5 m. Assuming that you have any required technology available suggest the most suitable ground improvement technique for this site giving reasons. (3 marks)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply