4. A contractor needs to accelerate his construction schedule. He is in the process of pouring a concrete wall. Labor id

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

4. A contractor needs to accelerate his construction schedule. He is in the process of pouring a concrete wall. Labor id

Post by answerhappygod »

4 A Contractor Needs To Accelerate His Construction Schedule He Is In The Process Of Pouring A Concrete Wall Labor Id 1
4 A Contractor Needs To Accelerate His Construction Schedule He Is In The Process Of Pouring A Concrete Wall Labor Id 1 (38.75 KiB) Viewed 14 times
4. A contractor needs to accelerate his construction schedule. He is in the process of pouring a concrete wall. Labor ideal productivity standard is 45 SF/hr. He has 8 man- crew. The hourly rate of a worker is S23 per hour. Each worker is paid two times the wage for any hours more than 8 hours a day. If a worker is required to work Saturday or Sunday, he is paid three times the wage for this period. Assume the total project quantity - 200,000 SF. Calculate the unit labor cost associated without and with overtime schedule (6 days - 11 hours/day with inefficiency = 21%). (25 points) Overtime Rate Double Time Without Overtime: . Required Hours Required weeks Total labor cost Unit labor cost . Overtime schedule (6D-11hrs): Adjusted Productivity Required Hours No. Hours/Week No. of Weeks Weekly Cost - Last Week Hours = Last Week Cost Total Labor Costa Unit Labor Cost
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply