Part 5 Use the plan view of the specified differential leveling operation to create complete field notes with all necess

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Part 5 Use the plan view of the specified differential leveling operation to create complete field notes with all necess

Post by answerhappygod »

Part 5 Use The Plan View Of The Specified Differential Leveling Operation To Create Complete Field Notes With All Necess 1
Part 5 Use The Plan View Of The Specified Differential Leveling Operation To Create Complete Field Notes With All Necess 1 (49 KiB) Viewed 15 times
Part 5 Use the plan view of the specified differential leveling operation to create complete field notes with all necessary information and calculations. Provide a mathematical check of your work in the field notes. The circles along the level line indicate instrument setups. The numbers are foresight and backsight readings from the instrument. P6-10 See Figure P6-10 9. BM 2 7.84 7.59 4.11 9.14 BM 1 496.92 Figure P6-10
Figure P6-10 P6-11 See Figure P6-11 0. BM 2 1.692 8.105 3.011 2.066 4.621 11.384 7.550 9.4413 BM 1 496.92
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply