5. (5 points) For the following area and roadway network, a new development in zone 1 will generate 1000 new vehicle tri

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

5. (5 points) For the following area and roadway network, a new development in zone 1 will generate 1000 new vehicle tri

Post by answerhappygod »

5 5 Points For The Following Area And Roadway Network A New Development In Zone 1 Will Generate 1000 New Vehicle Tri 1
5 5 Points For The Following Area And Roadway Network A New Development In Zone 1 Will Generate 1000 New Vehicle Tri 1 (141.29 KiB) Viewed 11 times
5. (5 points) For the following area and roadway network, a new development in zone 1 will generate 1000 new vehicle trips during the peak hour. The existing travel times and volumes are as shown. The new 1000 trips are to be assigned using the capacity-retrained method in 50% increment. Determine the volume of vehicle trips on R1, R2 and R3 after the new 1000 trips have been assigned. New development R3, Freeway, 50 mph - Imax= 2800 vph -ū = 27 minutes - Existing volume: 2600 veh - Travel time with existing traffic 40 min. 1 R1, Multilane, 50 mph - 9max=2000 vph - W = 24 minutes - Existing volume: 1800 veh - Travel time with existing traffic 39 min. 2 R2, Multilane, 50 mph - Amax= 2000 vph - W = 23 minutes - Existing volume: 2600 veh - Travel time with existing traffic 53 min.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply