- 5 A With Respect To Hydrograph Routing Explain The Underlying Difference Between River Routing And Level Pool Rou 1 (85.6 KiB) Viewed 18 times
5. (a) With respect to hydrograph routing, explain the underlying difference between "river routing" and "level pool rou
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
5. (a) With respect to hydrograph routing, explain the underlying difference between "river routing" and "level pool rou
5. (a) With respect to hydrograph routing, explain the underlying difference between "river routing" and "level pool routing". [3 Marks] (b) A dam is to be constructed to form a new reservoir. The dam spillway is 35m in length and has a crest elevation of 57.4 m. The spillway outflow (O) can be calculated from: 0 = 1.7Lh'', where is in m'/sL is the spillway length (m) and his depth of water above spillway crest (m). Table 1 shows the routing curve data for the reservoir. TableQ5- 1 Monthly flow volumes Outflow 05 15 28 43 60 78 99 120 (m/s) 2s 139284433588 751 923 1104 1292 At (m/s) lo +0 (1) 6 Construct the reservoir routing curves. [4 Marks) (IT) Assuming that the reservoir is initially full, route the inflow hydrograph shown in Table 2 through the reservoir until time = 10 hours. [12 Marks] TableQ5-2 Monthly flow volumes Time (hr) 0 1 2 3 4 5 7 8 9 10 11 Flow 0 8 34 116 200 195 168 114 61 27 8 0 (m/s) The following equation may be useful [1, 25, (i) What is maximum head of water over the spillway and the maximum expected water surface elevation? [4 marks] (iv) Determine the values of translation and attenuation. [2 marks] 25 les +bel+L -0,1 - [+03 At At 125 MARKS