5. (a) With respect to hydrograph routing, explain the underlying difference between “river routing” and “level pool rou

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

5. (a) With respect to hydrograph routing, explain the underlying difference between “river routing” and “level pool rou

Post by answerhappygod »

5 A With Respect To Hydrograph Routing Explain The Underlying Difference Between River Routing And Level Pool Rou 1
5 A With Respect To Hydrograph Routing Explain The Underlying Difference Between River Routing And Level Pool Rou 1 (127.14 KiB) Viewed 15 times
(a) With respect to hydrograph routing, explain the underlying
difference between “river routing” and “level pool routing”. [3
Marks]
(b) A dam is to be constructed to form a new reservoir. The dam
spillway is 35m in length and has a crest elevation of 57.4 m. The
spillway outflow (O) can be calculated from: O = 1.7Lh1.5, where O
is in m3 /s, L is the spillway length (m) and h is depth of water
above spillway crest (m).
Table 1 shows the routing curve data for the reservoir. TableQ5-
1 Monthly flow volumes
(i) Construct the reservoir routing curves. [4 Marks] (ii)
Assuming that the reservoir is initially full, route the inflow
hydrograph shown in Table 2 through the reservoir until time = 10
hours. [12 Marks]
TableQ5- 2 Monthly flow volumes The following equation may be
useful
(iii) What is maximum head of water over the spillway and the
maximum expected water surface elevation? [4 marks]
(iv) Determine the values of translation and attenuation. [2
marks]
5. (a) With respect to hydrograph routing, explain the underlying difference between “river routing” and “level pool routing”. [3 Marks) (b) A dam is to be constructed to form a new reservoir. The dam spillway is 35m in length and has a crest elevation of 57.4 m. The spillway outflow (O) can be calculated from: 0= 1.7Lh!.5, where is in m/s, L is the spillway length (m) and h is depth of water above spillway crest (m). Table 1 shows the routing curve data for the reservoir. TableQ5- 1 Monthly flow volumes Outflow 0 5 15 28 43 60 99 120 (mºs) 25 0 139284433588 751923 1104 1292 + ΔΙ. (m/s) 78 (1) Construct the reservoir routing curves. [4 Marks) (ii) Assuming that the reservoir is initially full, route the inflow hydrograph shown in Table 2 through the reservoir until time = 10 hours. [12 Marks) TableQ5- 2 Monthly flow volumes Time (hr) 0 1 2 3 4 5 7 8 11 Flow 08 34 116 200 195 168 114 61 27 8 0 (m/s) 6 9 10 +[ The following equation may be useful 25 2s, [1 +12]+ 0, +02 Δf At (iii) What is maximum head of water over the spillway and the maximum expected water surface elevation? [4 marks) (iv) Determine the values of translation and attenuation. [2 marks] [25 MARKS]