At the watershed outlet (2), you will have to design a bridge.
The water resource engineer gave you a 20-year return period flow,
so you based on your design on this value. What is your risk that
during the next 10 years at least once the bridge will flood.
At the watershed outlet (2), you will have to design a bridge. The water resource engineer gave you a 20-year return per
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am