TOPIC 3: EVAPORATION & INFILTRATION [CO1,P01] [10 Marks] The 120 minutes mass curve of rainfall in a catchment is given

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

TOPIC 3: EVAPORATION & INFILTRATION [CO1,P01] [10 Marks] The 120 minutes mass curve of rainfall in a catchment is given

Post by answerhappygod »

Topic 3 Evaporation Infiltration Co1 P01 10 Marks The 120 Minutes Mass Curve Of Rainfall In A Catchment Is Given 1
Topic 3 Evaporation Infiltration Co1 P01 10 Marks The 120 Minutes Mass Curve Of Rainfall In A Catchment Is Given 1 (34.57 KiB) Viewed 13 times
TOPIC 3: EVAPORATION & INFILTRATION [CO1,P01] [10 Marks] The 120 minutes mass curve of rainfall in a catchment is given in Table Q3. The catchment has an initial loss of 0.5 cm and the calculated phi-index is 0. o7 cm/hr Calculate the total surface runoff. . phi index value: 0.07 cmyhr -: Table Q3 Time from start of rainfall (min) Cumulative rainfall (cm) 0 0 20 0.5 40 1.2 60 2.6 80 3.3 100 4.1 120 5.2
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply