- 5 An Assembly Hall Was To Have An Air Conditioning Unit Installed Which Would Be Maintained 26 Cdry And Son The Unit D 1 (14.76 KiB) Viewed 36 times
5 An assembly hall was to have an air conditioning unit installed which would be maintained 26"Cdry and SON . The unit d
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
5 An assembly hall was to have an air conditioning unit installed which would be maintained 26"Cdry and SON . The unit d
5 An assembly hall was to have an air conditioning unit installed which would be maintained 26"Cdry and SON . The unit delivers air at 15°C dry bulb temperature and the calculated sensible heat load is 150 Watt heats 513 kW. Twenty percent by weight of extracted air is made up of outside wit 34" dry bulband while is extracted by the air conditioner from the assembly hali Determine the air conditioners capacity and its ventilation lead in tons of refrigeration. From prychometric chart365/ 53 / 83.22 TOR, 37 47 TOR C 76.43 TOR, 57.34 TOR 69.56 TOR. 45.77 TOR d 56.78 TOR 47.66 TOR Determine the quantity of water lost by bleed-off if the water flow rate over the tower is 30 pm and the range 10 Percent bleed-off required is 0.33% 0.077 pm 0.099 pm 0.066 pm а ова had