(Answer: 18 tubs,74 kW) An endless rope haulage delivers 640 ton of ore in an effective time of 8 hours. The incline at

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

(Answer: 18 tubs,74 kW) An endless rope haulage delivers 640 ton of ore in an effective time of 8 hours. The incline at

Post by answerhappygod »

Answer 18 Tubs 74 Kw An Endless Rope Haulage Delivers 640 Ton Of Ore In An Effective Time Of 8 Hours The Incline At 1
Answer 18 Tubs 74 Kw An Endless Rope Haulage Delivers 640 Ton Of Ore In An Effective Time Of 8 Hours The Incline At 1 (109.45 KiB) Viewed 10 times
mechanotechnics N5, please show all the steps and the answer is 48,5KW
(Answer: 18 tubs,74 kW) An endless rope haulage delivers 640 ton of ore in an effective time of 8 hours. The incline at 15' to the horizontal is 600 m long. If tubs with a capacity of one ton and a mass of 450 kg each are used, determine the power to drive the haulage engine. The efficiency of the drive is 80 %. Take the rope speed as 50 m/min with the tractive resistance as 190 N/ton, (Answer: 48,5 kW)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply