A company that does manufacturing work has one facility that is automated and one that has manual functions. In order to

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A company that does manufacturing work has one facility that is automated and one that has manual functions. In order to

Post by answerhappygod »

A Company That Does Manufacturing Work Has One Facility That Is Automated And One That Has Manual Functions In Order To 1
A Company That Does Manufacturing Work Has One Facility That Is Automated And One That Has Manual Functions In Order To 1 (21.99 KiB) Viewed 76 times
A company that does manufacturing work has one facility that is automated and one that has manual functions. In order to estimate the difference in mean time it takes to complete a part on the two lines, the company has requested that a random sample of 11 parts at each facility be tracked from start to finish and the time required be recorded. The sample data to the night were recorded Assuming that the populations are normally distributed with equal population variances, construct and interpret a 95% confidence interval estimate. Automated X = 58.3 hours $1 = 6.4 hours Manual X2 = 70.7 hours Sz6.8 hours The 95% confidence interval for the difference between the two population means for the length of time it takes to make a part from start to finish is D-2) (Round to two decimal places as needed.)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply