A generating station has the following daily lou L 2 Time (hours) 06 6-10 10-12 Load (MW) 20 25 30 u 12-16 25 4 1620 35
Posted: Fri May 20, 2022 8:54 pm
and the load factor
A generating station has the following daily lou L 2 Time (hours) 06 6-10 10-12 Load (MW) 20 25 30 u 12-16 25 4 1620 35 4 2024 20 15 - Plot the daily load curve 35 dir 3o 25 SOAN 25 90 10 lo Ic 14 16 IR lo 22 24 hr 1 6 8 lo