A generating station has the following daily lou L 2 Time (hours) 06 6-10 10-12 Load (MW) 20 25 30 u 12-16 25 4 1620 35

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A generating station has the following daily lou L 2 Time (hours) 06 6-10 10-12 Load (MW) 20 25 30 u 12-16 25 4 1620 35

Post by answerhappygod »

A Generating Station Has The Following Daily Lou L 2 Time Hours 06 6 10 10 12 Load Mw 20 25 30 U 12 16 25 4 1620 35 1
A Generating Station Has The Following Daily Lou L 2 Time Hours 06 6 10 10 12 Load Mw 20 25 30 U 12 16 25 4 1620 35 1 (215.44 KiB) Viewed 28 times
Find the: maximum demand, units generated per day, average load,
and the load factor
A generating station has the following daily lou L 2 Time (hours) 06 6-10 10-12 Load (MW) 20 25 30 u 12-16 25 4 1620 35 4 2024 20 15 - Plot the daily load curve 35 dir 3o 25 SOAN 25 90 10 lo Ic 14 16 IR lo 22 24 hr 1 6 8 lo