A new air-conditioning system is being planned for a UNZA theatre hall with options of two approaches, conventional (C)

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

A new air-conditioning system is being planned for a UNZA theatre hall with options of two approaches, conventional (C)

Post by answerhappygod »

A New Air Conditioning System Is Being Planned For A Unza Theatre Hall With Options Of Two Approaches Conventional C 1
A New Air Conditioning System Is Being Planned For A Unza Theatre Hall With Options Of Two Approaches Conventional C 1 (54.71 KiB) Viewed 32 times
A new air-conditioning system is being planned for a UNZA theatre hall with options of two approaches, conventional (C) and energy-efficient (EE). Information for the project is given in table Q2. If the EE-approach is being pursued: (a) Evaluate the net present value (NPV) and on the basis of the NPV, determine if the EE-approach is economically viable. (b) Evaluate the internal rate of return (IRR) expected for the EE-approach and comment on IRR in relation to the discount rate. Table Q2 - Project information Type Energy cost Capital cost (K/m) K280 K300 Energy consumption (kWh/m/yr 12 8 Project Interest Cost life/loan rate/discount escalation of period (yr) rate (%) energy (%) 15/15 18/20 5 с EE K2.00/kWh
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply