Sampling four pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produc

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Sampling four pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produc

Post by answerhappygod »

Sampling Four Pieces Of Precision Cut Wire To Be Used In Computer Assembly Every Hour For The Past 24 Hours Has Produc 1
Sampling Four Pieces Of Precision Cut Wire To Be Used In Computer Assembly Every Hour For The Past 24 Hours Has Produc 1 (73.79 KiB) Viewed 122 times
solve all the question and provide it clearly
Sampling four pieces of precision-cut wire (to be used in computer assembly) every hour for the past 24 hours has produced the following results (in cm): R 0.71 1.18 1.43 Hour 1 2 3 4 5 6 7 8 X 3.25 3.10 3.22 3.39 3.07 2.86 3.05 2.65 Hour 9 10 11 12 13 14 15 1.26 X 3.02 2.85 2.83 2.97 3.11 2.83 3.12 2.84 R 0.71 1.33 1.17 0.40 0.85 1.31 1.06 0.50 Hour 17 18 19 20 21 22 23 24 X 2.86 2.74 3.41 2.89 2.65 3.28 2.94 2.64 R 1.43 1.29 1.61 1.09 1.08 0.46 1.58 0.97 1.17 0.32 0.53 1.13 16 a) Determine the upper and lower control limits for r-charts and R-charts. b) Draw the charts and plot the values of the sample means and ranges. c) Do the data indicate a process that is in control? d) Why or why not?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply