4. Suppose that there are 17 tasks to be completed to assemble a product. Task times and the precedence relations are gi

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

4. Suppose that there are 17 tasks to be completed to assemble a product. Task times and the precedence relations are gi

Post by answerhappygod »

4 Suppose That There Are 17 Tasks To Be Completed To Assemble A Product Task Times And The Precedence Relations Are Gi 1
4 Suppose That There Are 17 Tasks To Be Completed To Assemble A Product Task Times And The Precedence Relations Are Gi 1 (516.94 KiB) Viewed 47 times
4. Suppose that there are 17 tasks to be completed to assemble a product. Task times and the precedence relations are given in below table. 1 6 7 8 9 10 11 12 13 14 15 16 17 2 | 3 | 4 | 5 73 6 5 4 5 11111 7 4 5 5 1 زرا 3 7 5 3 Task Task Time (min.) Immediate Predecessor(s) 2 2,3 44,5 7 8,9 10, 11 | 11 6 12 13, 14 15, 16 (a) Draw the precedence diagram for the given tasks. (b) What is the minimum theoretical number of workstations required if the cycle time is assumed to be 20 minutes? (c) Assuming a cycle time of 20 minutes, balance the line by the ranked positional weight method, and • Show the workstations on the precedence diagram. • Determine the idle time on each workstation. • Determine the layout of workstations (flow of material through the workstations)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply