QUESTION 3 3.1 A product (XX00) is made up of: 2 A parts; 1 B part and 1 C assembly. The C assembly is made up of 3 D pa

Posted: Fri May 20, 2022 7:10 am
by answerhappygod
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 1
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 1 (52.05 KiB) Viewed 37 times
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 2
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 2 (61.15 KiB) Viewed 37 times
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 3
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 3 (69.51 KiB) Viewed 37 times
QUESTION 3 3.1 A product (XX00) is made up of: 2 A parts; 1 B part and 1 C assembly. The C assembly is made up of 3 D parts, 2 E parts and 1 F subassembly. Each F subassembly is made up of 4 G parts and 8 H parts. The inventory report shows the following information about the product.
-4- Inventory recods Component Lot Size Lead On-hand Schedule Receipts time stock Quantity Week XX00 LFL 1 150 A 150 4 200 100 1 B LFL N 50 150 1 с 200 1 250 - D 100 lo 3 0 E 200 3 lo 150 80 2 F LFL 2 120 G LFL 1 0 150 1 H LFL 1 400
The MPS shows these quantities of XXOO required: Week 1 2 3 4 5 6 7 8 XX00 200 300 3.1.1 Construct a product structure tree for the product. (4) 3.1.2 Develop a Material Requirements Plan (MRP) to cover a 7-week planning period given the requirements in the Master Production Schedule (MPS). Use the table on the next page to answer this question (16)