QUESTION 3 3.1 A product (XX00) is made up of: 2 A parts; 1 B part and 1 C assembly. The C assembly is made up of 3 D pa

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

QUESTION 3 3.1 A product (XX00) is made up of: 2 A parts; 1 B part and 1 C assembly. The C assembly is made up of 3 D pa

Post by answerhappygod »

Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 1
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 1 (52.05 KiB) Viewed 35 times
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 2
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 2 (61.15 KiB) Viewed 35 times
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 3
Question 3 3 1 A Product Xx00 Is Made Up Of 2 A Parts 1 B Part And 1 C Assembly The C Assembly Is Made Up Of 3 D Pa 3 (69.51 KiB) Viewed 35 times
QUESTION 3 3.1 A product (XX00) is made up of: 2 A parts; 1 B part and 1 C assembly. The C assembly is made up of 3 D parts, 2 E parts and 1 F subassembly. Each F subassembly is made up of 4 G parts and 8 H parts. The inventory report shows the following information about the product.
-4- Inventory recods Component Lot Size Lead On-hand Schedule Receipts time stock Quantity Week XX00 LFL 1 150 A 150 4 200 100 1 B LFL N 50 150 1 с 200 1 250 - D 100 lo 3 0 E 200 3 lo 150 80 2 F LFL 2 120 G LFL 1 0 150 1 H LFL 1 400
The MPS shows these quantities of XXOO required: Week 1 2 3 4 5 6 7 8 XX00 200 300 3.1.1 Construct a product structure tree for the product. (4) 3.1.2 Develop a Material Requirements Plan (MRP) to cover a 7-week planning period given the requirements in the Master Production Schedule (MPS). Use the table on the next page to answer this question (16)