Question 1 Prior to launching a new model, a manufacturing company needs to set up a new flow line which will produce 11

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Question 1 Prior to launching a new model, a manufacturing company needs to set up a new flow line which will produce 11

Post by answerhappygod »

Question 1 Prior To Launching A New Model A Manufacturing Company Needs To Set Up A New Flow Line Which Will Produce 11 1
Question 1 Prior To Launching A New Model A Manufacturing Company Needs To Set Up A New Flow Line Which Will Produce 11 1 (80.28 KiB) Viewed 53 times
Question 1 Prior to launching a new model, a manufacturing company needs to set up a new flow line which will produce 1100 products per day. The manufacturer operates 24 hours per day. The assembly information for the new product is outlined in Table Q1 below. a) Calculate the maximum cycle time. (3 marks) b) Calculate the theoretical minimum number of work stations. (3 marks) c) Produce the precedence diagram. (7 marks) d) Produce the line design which achieves the required cycle time. (7 marks) e) Calculate the idle time/cycle and the output level based upon the new cycle time produced in (d). (5 marks) TASK PREDECESSOR A TIME (sec) 42 19 20 B c А A D 35 E 17 F 19 G 1 20 30 D D B C,E,F H GI H 25 I J 65 30 J K L M 46 J 58 KL Table Q1 Total: 25 Marks
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply