Waterways (This is a continuation of the Waterways case from Chapters 14 through 23.) WC24 Waterways Corporation uses ve

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Waterways (This is a continuation of the Waterways case from Chapters 14 through 23.) WC24 Waterways Corporation uses ve

Post by answerhappygod »

Waterways This Is A Continuation Of The Waterways Case From Chapters 14 Through 23 Wc24 Waterways Corporation Uses Ve 1
Waterways This Is A Continuation Of The Waterways Case From Chapters 14 Through 23 Wc24 Waterways Corporation Uses Ve 1 (71.19 KiB) Viewed 67 times
Waterways (This is a continuation of the Waterways case from Chapters 14 through 23.) WC24 Waterways Corporation uses very stringent standard costs in evaluating its manufacturing efficiency. These standards are not "ideal" at this point, but the management is working toward that as a goal. At present, the company uses the following standards. Item Direct Materials Per unit 2 lb. Materials Cost 804 per lb. Item Labor Direct Labor Per unit 15 min. Cost $8.00 per hr Predetermined overhead rate based on direct labor hours = $4.28 The January figures for purchasing, production, and labor are: The company purchased 229,000 pounds of raw materials in January at a cost of 78¢ a pound Production used 229,000 pounds of raw materials to make 115,500 units in January Direct labor spent 18 minutes on each product at a cost of $7.80 per hour. Overhead costs for January totaled $54,673 variable and $73,800 fixed. Instructions Answer the following questions about standard costs. (a) What is the materials price variance? (b) What is the materials quantity variance? (c) What is the total materials variance? (d) What is the labor price variance? (e) What is the labor quantity variance? (f) What is the total labor variance? (g) What is the total overhead variance? (h) Evaluate the variances for this company for January. What do these variances suggest to management?
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply