Page 1 of 1

Braverman Company has two manufacturing departments-Finishing and Fabrication. The predetermined overhead rates in Finis

Posted: Thu May 19, 2022 2:54 pm
by answerhappygod
Braverman Company Has Two Manufacturing Departments Finishing And Fabrication The Predetermined Overhead Rates In Finis 1
Braverman Company Has Two Manufacturing Departments Finishing And Fabrication The Predetermined Overhead Rates In Finis 1 (21.12 KiB) Viewed 51 times
Braverman Company has two manufacturing departments-Finishing and Fabrication. The predetermined overhead rates in Finishing and Fabrication are $23.00 per direct labor hour and 110% of direct materials cost, respectively. The company's direct labor wage rate is $29.00 per hour. The following information pertains to Job 700 Finishing Fabrication Direct materials $ 475 $ 100 Direct labor $ 232 $ 116 Required: 1. What is the total manufacturing cost assigned to Job 700? 2. If Job 700 consists of 5 units, what is the unit product cost for this job? (Round your answer to 2 decimal places Answer is complete but not entirely correct. 1. Total manufacturing cost $ 1227 2 Unit product cost $ 245 40 % per unit