Braverman Company has two manufacturing departments-Finishing and Fabrication. The predetermined overhead rates in Finis

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

Braverman Company has two manufacturing departments-Finishing and Fabrication. The predetermined overhead rates in Finis

Post by answerhappygod »

Braverman Company Has Two Manufacturing Departments Finishing And Fabrication The Predetermined Overhead Rates In Finis 1
Braverman Company Has Two Manufacturing Departments Finishing And Fabrication The Predetermined Overhead Rates In Finis 1 (21.12 KiB) Viewed 49 times
Braverman Company has two manufacturing departments-Finishing and Fabrication. The predetermined overhead rates in Finishing and Fabrication are $23.00 per direct labor hour and 110% of direct materials cost, respectively. The company's direct labor wage rate is $29.00 per hour. The following information pertains to Job 700 Finishing Fabrication Direct materials $ 475 $ 100 Direct labor $ 232 $ 116 Required: 1. What is the total manufacturing cost assigned to Job 700? 2. If Job 700 consists of 5 units, what is the unit product cost for this job? (Round your answer to 2 decimal places Answer is complete but not entirely correct. 1. Total manufacturing cost $ 1227 2 Unit product cost $ 245 40 % per unit
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply