7. (20 pts) A company makes two products X and Y, using two machines A and B. Each unit of X that is produced requires 5
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
7. (20 pts) A company makes two products X and Y, using two machines A and B. Each unit of X that is produced requires 5
company makes two products X and Y, using two machines A and B. Each unit of X that is produced requires 50 minutes processing time on machine A and 30 minutes time on machine B. Each unit of Y that is produced requires 24 minutes processing time on machine A and 33 minutes time on machine B. Available processing time on machine. A is 40 hours and on machine B is 35 hours. The demand for X in the current week is 35 units and for Y is 5 units. Company policy is to maximize the combined sum of the units of X and the units of Y at the end of the week. Formulate the problem as linear program and solve graphically 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 10 20 30 40 50 60 70
7. (20 pts) A