7. (20 pts) A company makes two products X and Y, using two machines A and B. Each unit of X that is produced requires 5

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

7. (20 pts) A company makes two products X and Y, using two machines A and B. Each unit of X that is produced requires 5

Post by answerhappygod »

7 20 Pts A Company Makes Two Products X And Y Using Two Machines A And B Each Unit Of X That Is Produced Requires 5 1
7 20 Pts A Company Makes Two Products X And Y Using Two Machines A And B Each Unit Of X That Is Produced Requires 5 1 (37.36 KiB) Viewed 75 times
7. (20 pts) A company makes two products X and Y, using two machines A and B. Each unit of X that is produced requires 50 minutes processing time on machine A and 30 minutes time on machine B. Each unit of Y that is produced requires 24 minutes processing time on machine A and 33 minutes time on machine B. Available processing time on machine. A is 40 hours and on machine B is 35 hours. The demand for X in the current week is 35 units and for Y is 5 units. Company policy is to maximize the combined sum of the units of X and the units of Y at the end of the week. Formulate the problem as linear program and solve graphically 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 10 20 30 40 50 60 70
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply