7. Oumar pulls a sled across level snow with a force of 225 N along a rope that is 35.0° above the horizontal. If the sl

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

7. Oumar pulls a sled across level snow with a force of 225 N along a rope that is 35.0° above the horizontal. If the sl

Post by answerhappygod »

7 Oumar Pulls A Sled Across Level Snow With A Force Of 225 N Along A Rope That Is 35 0 Above The Horizontal If The Sl 1
7 Oumar Pulls A Sled Across Level Snow With A Force Of 225 N Along A Rope That Is 35 0 Above The Horizontal If The Sl 1 (80.23 KiB) Viewed 68 times
7. Oumar pulls a sled across level snow with a force of 225 N along a rope that is 35.0° above the horizontal. If the sled moved a distance of 65.3 m, how much work did he do? [2 marks] 8. Alishaz pushes a crate across the floor of a factory with a horizontal force. The roughness of the floor changes, and Alishaz must exert a constant force of 20.0 N for 5.00m, then 35.0 N for 12.Om and finally 10.0 N for 8.00m. a. Draw a graph of force vs. distance using the available data. [2 i narks] b. Find the work he does pushing the crate by using the graph. [2 marks]
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply