5. [10 points) A private company in Kızıldere Geothermal Field wants to construct a binary power plant. The reservoir te

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

5. [10 points) A private company in Kızıldere Geothermal Field wants to construct a binary power plant. The reservoir te

Post by answerhappygod »

5 10 Points A Private Company In Kizildere Geothermal Field Wants To Construct A Binary Power Plant The Reservoir Te 1
5 10 Points A Private Company In Kizildere Geothermal Field Wants To Construct A Binary Power Plant The Reservoir Te 1 (51.94 KiB) Viewed 39 times
5. [10 points) A private company in Kızıldere Geothermal Field wants to construct a binary power plant. The reservoir temperature Tres, in Kızıldere Geothermal Field is assumed to be 230 °C. Using the information given in Table 1, calculate the installed power (MW) for this geothermal plant. Hint: First use the total stored heat, then use lower equation for power calculations. Power Hotal * RF x%Y where, RF is recovery factor (fraction), Y is conversion LF x tp efficiency (fraction), LF is load factor (fraction) and tp is life of the project (s). RF: 0.16, Y =0.0935 Tres -2.3266, LF:0.90 and tp:30 years. Table 1. Information about Kızıldere Geothermal Field. Reservoir area, km 6 Reservoir thickness, m 2500 0,% 8 Density of rock, gr/cm 2.65 Density of reservoir fluid, kg/m 861 Specific heat of rock, kJ/kg°C 0.9 Specific heat of reservoir fluid, kJ/kg"C 4.18 Reservoir rocks and fluid are in thermally equilibrium.