1. A contractor needs to accelerate his construction schedule. He is in the process of placing wall forms for the pourin

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

1. A contractor needs to accelerate his construction schedule. He is in the process of placing wall forms for the pourin

Post by answerhappygod »

1 A Contractor Needs To Accelerate His Construction Schedule He Is In The Process Of Placing Wall Forms For The Pourin 1
1 A Contractor Needs To Accelerate His Construction Schedule He Is In The Process Of Placing Wall Forms For The Pourin 1 (93.32 KiB) Viewed 29 times
1. A contractor needs to accelerate his construction schedule. He is in the process of placing wall forms for the pouring of a concrete wall. His ideal productivity standard is 5 person- hours per 100 square feet of contact area (SFCA). He has a 4 man-crew placing the wall forms. The hourly rate of a worker is $20 per hour. Each worker is paid time-and-one-half for any hours in excess of 8 hours a day. If a worker is required to work Saturday or Sunday, he is paid double time for this period. Assume the total project quantity = 80,000 SFCA. Assume that the contractor has gathered the following data regarding his loss of efficiency with overtime: Days 5 Hours 11 10 Total weekly hours 55 70 Inefficiency (%) 17 27 7 a) Calculate the unit labor cost associated with the two alternative overtime schedules. b) Assume that the contractor is penalized $1,000 per day if the work lasts in excess of 20 weeks. Which overtime schedule would you suggest to minimize the overall cost of doing the work?