You are Chief Engineer for a Municipal Utility Authority (MUA) responsible for decisions related to investment and opera

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

You are Chief Engineer for a Municipal Utility Authority (MUA) responsible for decisions related to investment and opera

Post by answerhappygod »

You Are Chief Engineer For A Municipal Utility Authority Mua Responsible For Decisions Related To Investment And Opera 1
You Are Chief Engineer For A Municipal Utility Authority Mua Responsible For Decisions Related To Investment And Opera 1 (93.01 KiB) Viewed 58 times
You are Chief Engineer for a Municipal Utility Authority (MUA) responsible for decisions related to investment and operation at the MUA's Water Resource Recovery Facility (WRRF). It's Monday. 1. The WRRF has a mesophilic complete-mix anaerobic digester. A Rotary Drum Thickener is used to prethicken 95,000 gpd of mixed primary and secondary sludge from 1.5% to 4% sludge solids by weight before digestion. After digestion the sludge is hauled as a flowable liquid sludge for processing at a larger regional plant at a total cost of $0.035 per gallon - there is no extra dewatering. The sludge solids are 65% volatile and the digester currently achieves 70% volatile solids reduction (VSR) and yields 14 CF of digester gas per lb of VSR. The digester gas has a Lower Heating Value (LHV) of 550 btu/CF and is currently used in a CHP system which offsets electricity at $0.13/kWh and pre-heats the thickened sludge from 60 °F to mesophilic temperatures of 100 ° F. If the CHP can't capture enough heat for autothermal heating, natural gas is purchased at $7.50 per 1,000 CF with an LHV of 1,000 btu/CF. The backup plant boiler cannot use digester gas. The CHP system recovers 40% the biogas calorific value as electrical energy and 40% as heat for sludge pre-heating, and has a 95% uptime. A. What is the influent and effluent solids mass balance to the digester (tons per day)? (4) B. What is the current cost of sludge disposal annually ($/yr)? (3) C. What is the potential energy of the digester biogas (btu/hr) (2) D. What is the engine electrical power (kW) (2) E. What is the value of the offset electric ($/yr) (2) F. Is the CHP sufficient to pre-heat the sludge? (3) G. What is the cost of natural gas that must be purchased for when the CHP is not operating ($/yr)? (1)
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply