Please can you complete this on Oracle Primavera p6 and
report format thanks
The project assignment two deliverables logically completed and concisely documented as a report, include: Tasks Description Requirement/Responsibility/ Mark Question s 6.2.5 The method statement Lecture 5.3: Question 5: 40 Task 5: should explain the Question 5.1: Produce a method Method proposed statement, in a tabular format, of Stateme method of the building; activities for Earthworks and nt with it can be tabulated or foundation (WBS code 1.5.2), JHA. Do in bullet points. including the JHA. not use Should have an P6. indication and estimate Tabular format Example: for activity durations. A logical sequence should be observed and apparent. Students should acknowledge safety considerations based on the identification of the main hazards. Accordingly, as part of the common practice, the construction and safety method statement for each work activity should be combined into a single document. 10 1 1 6.2.6 Events, tasks, subtasks Lecture 5.2.2: Question 6 Task 6: and work packages Question 6.1: Open project Activitie require a sequence assignment 1 in P6 S relationship in a logical Sequenc order. Some of the Question 6.2: Create activity 7
ing activities are relationships and relationship types. completed before others can start, starts Note: the relationship must include simultaneously, etc. at least 2 of the different types of Students should ensure activity relationships. that the activity Question 6.3: State one activity for 2 sequencing contains all the two relationship types in the P6 the six (6) types of activity network you created. relationships. The activities must have Note: One activity for one durations and a logical relationship type. predecessor or successor. Sequence all activities in P6 Lecture 5.2.4: Question 7 25 Question 7.1: Schedule the project 1 with the data date. Note: you must show how you scheduled the project by stating the total duration and total float. Question 7.2: There is a change in the plan requiring finishing the project earlier because of an urgent demand and reducing the period for the return on investment. Therefore, the project must finish two months earlier. 6.2.7 Scheduling a project Task 7: calculates the activity Activitie start/finish dates S according to durations Scheduli and logic. 1 ng and 1 Time Analysis Question 7.2.1: Assign a Must Finish By Constraint to the project. Question 7.2.2: Reschedule the project. Question 7.2.3: What is the Total Float on the project after rescheduling? 1 .Va.. L... consulated
Question 7.3: You have completed the scheduling, and the supplier for Igu curtain wall cladding material notified the contractor that the material delivery requires an extra 14 working days. The contractor does not want to replace the specified material with another Igu curtain material. Project Assignment 2 Brief ENBU707 Construction Planning, Semester 1, 2022 AUT Page 11 2 Question 7.3.1: Assign a Start On or Start After Constraint to the Igu curtain wall cladding activity using the added 14 days delay date. 1 2 Question 7.3.2: Schedule the project again with the data date. Question 7.3.3: Does the constraint on lgu curtain wall cladding activity affect the project finish date? If not, why?
Create the Question 7.3.4: Schedule Log in P6. Use the schedule log to answer Question 7.3.4.1 - Question 7.3.4.6 Question 7.3.4.1: How many 1 activities are in the project? Question 7.3.4.2: How many of 1 them are critical? Question 7.3.4.3: How many 1 project activities do not have predecessors and successors? Question 7.3.4.4: List the project 2 activities without predecessors and successors? Question 7.3.4.5: How many 2 relationships are in the project? Question 7.3.4.6: What is the 1 latest early finish date for the project? Question 7.3.4.7: State one (1) 2 activity with a driving relationship and one (1) activity with a non- driving relationship. Question 7.4: Calculate the total 6 float for each activity with the imposed Finish date of 13, in Figure 3. Do not use P6. Note: The numbers at the centre of the figure are the activity durations. Project Assignment 2 Brief ENBU707 Construction Planning, Semester 1, 2022 AUT
ID Permit ID Foundation ID Equipment Purchase ID Bled Services PROJECT END PROJECT END 0 2 1 3 8 0 ng and Figure 3: Lecture 5.4: Question 7.5 6.2.8 The required roles and Lecture 5.5: Question 8 25 Task 8: resources, including Question 8.1: Create roles for 2 Resourc material, men, and Activity with Role details. e non-labour, needs to Question 8.2.1: Assign price rates 2 Scheduli be allocated to the to roles. relevant identified Budgeti tasks. Question 8.2.2: What is the 1 ng purpose of assigning rates to a role when the resources which ultimately perform actual work might have different rates than those listed? Question 8.3: _Identify the project 9 resources in this format, example. Activity in Activity Name Resource ID Resource Name Resource type Budget Units/Time Rate BA100 Foundation Excavation Excavator Equipment BAIO Foundation for Leve $150/h Trades 8h/d 8h/d Smith Labour $40/h Question 8.4: _The project team 2 assigned a testing engineer to confirm the concrete strength during foundation works. The concrete works programme is two weeks (Five working days per week) with the budget units per time of 1 hour per day for the Testing Engineer. What type of activity is the concrete testing activity? Calculate the Budgeted unit of the Testing Engineer. Half the mark will be deducted if the calculation has no correct unit of measurement. Do not use P6. Question 8.5: Assign the identified 8 resources - single resources and/or multiple resources in Question 8.3, including the level of effort in activities and expenses for all the
Question 8.6: _What is the total 1 cost of the project? 6.2.9 There is a need to Lecture 5.6: Question 9 27 Project Assignment 2 Brief ENBU707 Construction Planning, Semester 1, 2022 AUT Page 13 Task 9: optimise the project Plan plan by analysing optimisa schedule dates and tion and shortening the project Baselini duration. Analysing the ng resource availability, resolving resource overallocation, and project costs are fundamental to keeping within the project constraints. The optimised schedule is applied to create the project plan baseline. Question 9.1: Compare the 1 project's Finish date to its Must Finish By date. Question 9.1.1: What is the Finish 1 date? Question 9.1.2: What is the Must 1 Finish By date Question 9.1.3: Is the project 1 scheduled to finish on time? Question 9.1.4: How many days 1 behind or ahead of schedule is the project? Question 9.2: Define and present 3 the project's critical path. Question 9.3: Shorten the project 4 by modifying activity relationships, including adding lag and others. Question 9.4: Reschedule the 2 project with a data date.
scheduled to finish on time? fundamental to keeping within the Question 9.1.4: How many days 1 project constraints. behind or ahead of schedule is the The optimised project? schedule is applied to Question 9.2: Define and present 3 create the project plan the project's critical path. baseline. Question 9.3: Shorten the project 4 by modifying activity relationships, including adding lag and others. Question 9.4: Reschedule the 2 project with a data date. Is the project now scheduled to finish on time? Question 9.5: You have to ensure that the project resources are not over-allocated. Question 9.5.1: _Are any project 1 resources overallocated? Question 9.5.2: Which weeks show 2 overallocation for the resource? Question 9.5.3: Use the tabular 2 format below to list the overallocated resource activities. Activity IDs for Week #1 Activity IDs for Week #2 Activity IDs for Week #3 Question 9.5.4: Which activity 1 occurs in all three weeks? Question 9.5.5: Replace the 2 overallocated resource with another resource to remove the overallocation Remember to press F5 on your keyboard to refresh the data. Project Assignment 2 Brief ENBU707 Construction Planning, Semester 1, 2022 AUT
Question 9.5.6: Which activities 2 did you assign the new resource? 1 Question 9.6: Now that the schedule and resources have been optimised to ensure that the cost is acceptable. The apartment building project has an original budget of $500,000. Is the project within budget? Question 9.7: Create a baseline 2 plan and display the baseline bars on the Gantt chart.
Please can you complete this on Oracle Primavera p6 and report format thanks
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
Please can you complete this on Oracle Primavera p6 and report format thanks