QUESTION 1.1 A generating station has a maximum demand of 200MW, a load factor of 65% plant capacity factor of 50% and a

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

QUESTION 1.1 A generating station has a maximum demand of 200MW, a load factor of 65% plant capacity factor of 50% and a

Post by answerhappygod »

Question 1 1 A Generating Station Has A Maximum Demand Of 200mw A Load Factor Of 65 Plant Capacity Factor Of 50 And A 1
Question 1 1 A Generating Station Has A Maximum Demand Of 200mw A Load Factor Of 65 Plant Capacity Factor Of 50 And A 1 (165.02 KiB) Viewed 67 times
QUESTION 1.1 A generating station has a maximum demand of 200MW, a load factor of 65% plant capacity factor of 50% and a plant use factor of 75%. Determine: 1.1.1 The reserve capacity of the plant [5] 1.1.2 The daily energy produced [2] 1.1.3 Maximum energy that could be produced daily if the plant is fully loaded.[2] 1.1.4 The annual fixed charges if the annual fixed charges are R150.00 per kW of installed capacity. [2] 1.1.5 The cost per unit generated if the running charges are 8 cents per kWh. [4]
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply