Example Problem for PhD subject qualifying exams The generalized logistic curve (a.k.a. Richard's curve) along with the

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Example Problem for PhD subject qualifying exams The generalized logistic curve (a.k.a. Richard's curve) along with the

Post by answerhappygod »

Example Problem For Phd Subject Qualifying Exams The Generalized Logistic Curve A K A Richard S Curve Along With The 1
Example Problem For Phd Subject Qualifying Exams The Generalized Logistic Curve A K A Richard S Curve Along With The 1 (63.81 KiB) Viewed 32 times
Example Problem for PhD subject qualifying exams The generalized logistic curve (a.k.a. Richard's curve) along with the S.I.R. (Susceptible Infectious and Removed) model are among the simplest models used in growth modeling and mathematical modeling of infectious diseases like the recent Coronavirus disease (COVID-19); see e.g., Figure 1 below. Coronavirus epidemic in Spain (SiR modely R - 1.745 8= 0.519 = 0.297 N = 239615 = 170828 - 58287 RMSE = 710 200 150 -Prediction Infocond (x1000 cases) 100 50 03/01/20 06/01/20 04/01/20 05.01:20 Date Infection Rate in Spain Total Infected: 126168, Total Dead 11947 10000 Actual -Prediction 8000 6000 casesday 4000 2000 03/01/20 04/01/20 05/0120 06/01/20 Date K-A The generalized logistic function/curve is defined as: Y(t) = A +- (C+Qe-3(2-0) where Y is the prediction/projection at timet (commonly in days), A, K are the lower and upper asymptotes, respectively, Bis the growth rate, Q affects the value at t=0, v affects the maximum growth position and M corresponds to the maximum growth time, if Q=v=1. Assuming now that C-Q-1 Question 1: formulate an optimization problem that determines the generalized logistic curve for a given set of country- specific timeseries data; use a simple least squares approach Question 2. Did you formulate the above problem as an unbounded or a constrained optimization problem; justify your selection in any case, and mention the type of constraints, if any, you are including in your formulation Question 3: What is the cardinality of the design space? Question 4: Will you use A as a design variable or not? If yes, explain why and if not, specify the value you are going to use for A. Question 5: Will you use K as a design variable or not? If yes, explain why and if not, specify the value you are going to use for K. Question 6: Ist a component of the design vector? Justify your answer in any case.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply