Use the Excel Solver output for a maximization LP problem to determine which constraints are binding. Objective Function

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Use the Excel Solver output for a maximization LP problem to determine which constraints are binding. Objective Function

Post by answerhappygod »

Use The Excel Solver Output For A Maximization Lp Problem To Determine Which Constraints Are Binding Objective Function 1
Use The Excel Solver Output For A Maximization Lp Problem To Determine Which Constraints Are Binding Objective Function 1 (69.72 KiB) Viewed 30 times
Use The Excel Solver Output For A Maximization Lp Problem To Determine Which Constraints Are Binding Objective Function 2
Use The Excel Solver Output For A Maximization Lp Problem To Determine Which Constraints Are Binding Objective Function 2 (67.76 KiB) Viewed 30 times
Use The Excel Solver Output For A Maximization Lp Problem To Determine Which Constraints Are Binding Objective Function 3
Use The Excel Solver Output For A Maximization Lp Problem To Determine Which Constraints Are Binding Objective Function 3 (75.73 KiB) Viewed 30 times
Use The Excel Solver Output For A Maximization Lp Problem To Determine Which Constraints Are Binding Objective Function 4
Use The Excel Solver Output For A Maximization Lp Problem To Determine Which Constraints Are Binding Objective Function 4 (47.98 KiB) Viewed 30 times
Use the Excel Solver output for a maximization LP problem to determine which constraints are binding. Objective Function Value = 7475.00 Variable Cells Final Reduced Objective Allowable Allowable Coefficient Increase Decrease Name Value Cost P1 8 0 100 12.5 1E+30 5 P2 0 -5 120 1E+30 P3 17 0 150 12.5 25 P4 33 0 125 25 5 Constraints Final Shadow Value Price Constraint Allowable Allowable R.H. Side Increase Decrease Name Constraint A 108 0 118 15.75 8 157 10 157 1E+30 63 Constraint B Constraint Constraint D 25 25 25 33 17 8.5 50 -25 50 4 Constraint D only

Final Reduced Objective Allowable Allowable Coefficient Increase Decrease Name Value Cost P1 8 0 100 1E+30 12.5 P2 0 -5 120 5 1E+30 P3 17 0 150 12.5 25 P4 33 0 125 25 5 Constraints Final Shadow Value Price Constraint Allowable Allowable R.H. Side Increase Decrease Name 108 0 118 15.75 8 Constraint A Constraint B Constraint C 157 10 157 1E+30 63 25 25 25 33 17 Constraint D 50 -25 50 4 8.5 Constraint D only Constraints B.C. & D only Constraints A & C only All the constraints are binding Constraints B & D only

Determine the new objective function value if the RHS of the Space Constraint increases by 5 units. Objective Function Value = $51.00 Variable Cells Final ReducedObjective AllowableAllowable ValueCost Coefficientincrease Decrease Name Variable15 0 6 4 1 Variable23 0 7 1.5 2.67 Constraints Final Shadow Constraint Allowable Allowable Name ValuePrice R.H. Side Increase Decrease Labor 12 4 12 3 3 Wood 6.40 14 7.6. 1E+30 Space 12 3 12 6 1.8 Limit 3.20 10 6.8 1E+30 Must recalculate because increase exceeded the range of feasibility $47 $15 $66

Create a forecast for Week 5 using a 2-week weighted moving average if the most current weight is 0.65. Week Sales 1 90 2. 97 3 105 4 110 94.55 108.25 O 93.5 107.5 106,75
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply