1. Consider a manufacturing process composed of three stages – (R1, R2 and R3). Stage one consists of 2 machines arrange

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899603
Joined: Mon Aug 02, 2021 8:13 am

1. Consider a manufacturing process composed of three stages – (R1, R2 and R3). Stage one consists of 2 machines arrange

Post by answerhappygod »

1 Consider A Manufacturing Process Composed Of Three Stages R1 R2 And R3 Stage One Consists Of 2 Machines Arrange 1
1 Consider A Manufacturing Process Composed Of Three Stages R1 R2 And R3 Stage One Consists Of 2 Machines Arrange 1 (51.71 KiB) Viewed 87 times
1 Consider A Manufacturing Process Composed Of Three Stages R1 R2 And R3 Stage One Consists Of 2 Machines Arrange 2
1 Consider A Manufacturing Process Composed Of Three Stages R1 R2 And R3 Stage One Consists Of 2 Machines Arrange 2 (76.85 KiB) Viewed 87 times
1. Consider a manufacturing process composed of three stages – (R1, R2 and R3). Stage one consists of 2 machines arranged in a doubly redundant sub system. Stage two has 3 machines that work in series, meaning that this stage operates successfully only if all the machines operate. Stage three is made up of 4 machines and only operates successfully if at least 2 machines operate. The three manufacturing stages are connected in series to produce the final product, meaning that they must all work properly to produce a final product.

Between two scheduled maintenances, each machine may fail independently of the others, with the following failure probabilities: R1 0.18 0.22 R2 0.19 0.29 0.28 R3 0.35 0.24 0.19 0.38 Use this information to answer the following questions to 3 decimal places (expressing probability as a number between 0 and 1 and do not specify units or enter text of any kind): 1. The reliability of sub system stage 1 is. 2. The reliability of sub system stage 2 is. 3. The reliability of sub system stage 3 is. 4. At stage 3 the probability of 2 machines breaking down between scheduled maintenances is. 5. The probability of the manufacturing process as a whole failing between scheduled maintenances is.