- 12 Marks M 25 R 417 On 8 In Control Chart Used For Assessment Of Stability Process Mean Was 25 And Buch 4 Was Used Fo 1 (21.34 KiB) Viewed 56 times
(12 marks) M=25 R=417 on 8 In control chart used for assessment of stability, process mean was 25 and Buch 4 was used fo
-
- Site Admin
- Posts: 899603
- Joined: Mon Aug 02, 2021 8:13 am
(12 marks) M=25 R=417 on 8 In control chart used for assessment of stability, process mean was 25 and Buch 4 was used fo
(12 marks) M=25 R=417 on 8 In control chart used for assessment of stability, process mean was 25 and Buch 4 was used for drawing sample. a) What percentage meets the specification and b) What percentage does not meet the specification