A manufacturer of skis produces two types downhill and cross-country. The times required for manufacturing and finishing
Posted: Tue May 10, 2022 8:11 am
A manufacturer of skis produces two types downhill and cross-country. The times required for manufacturing and finishing each ski are given in the table. The maximum total weekly hours avaitable for manufacturing and finishing the skis are 60 hours and 42 hours, respectively. The profits per ski are $80 for downhill and $50 for cross-country Determine how many of each kind of ski should be produced to achieve a maximum profit. Downhill Cross-country Manufacturing time per skl 25 hours 1.5 hours Finishing time per ski 1 hour 1.5 hours GED To achieve maximum profit, the manufacturer should produce downhill sks and cross-country skis.