A manufacturer of skis produces two types downhill and cross-country. The times required for manufacturing and finishing

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

A manufacturer of skis produces two types downhill and cross-country. The times required for manufacturing and finishing

Post by answerhappygod »

A Manufacturer Of Skis Produces Two Types Downhill And Cross Country The Times Required For Manufacturing And Finishing 1
A Manufacturer Of Skis Produces Two Types Downhill And Cross Country The Times Required For Manufacturing And Finishing 1 (15.26 KiB) Viewed 25 times
A manufacturer of skis produces two types downhill and cross-country. The times required for manufacturing and finishing each ski are given in the table. The maximum total weekly hours avaitable for manufacturing and finishing the skis are 60 hours and 42 hours, respectively. The profits per ski are $80 for downhill and $50 for cross-country Determine how many of each kind of ski should be produced to achieve a maximum profit. Downhill Cross-country Manufacturing time per skl 25 hours 1.5 hours Finishing time per ski 1 hour 1.5 hours GED To achieve maximum profit, the manufacturer should produce downhill sks and cross-country skis.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply