Page 1 of 1

Assignment 1: Belt Conveyor An underground copper block caving operation, shown in the diagram, is planning to use a bel

Posted: Mon May 09, 2022 9:12 am
by answerhappygod
Assignment 1 Belt Conveyor An Underground Copper Block Caving Operation Shown In The Diagram Is Planning To Use A Bel 1
Assignment 1 Belt Conveyor An Underground Copper Block Caving Operation Shown In The Diagram Is Planning To Use A Bel 1 (56.25 KiB) Viewed 14 times
Assignment 1 Belt Conveyor An Underground Copper Block Caving Operation Shown In The Diagram Is Planning To Use A Bel 2
Assignment 1 Belt Conveyor An Underground Copper Block Caving Operation Shown In The Diagram Is Planning To Use A Bel 2 (56.25 KiB) Viewed 14 times
Assignment 1: Belt Conveyor An underground copper block caving operation, shown in the diagram, is planning to use a belt conveyor as the primary mode of moving ore out of the mine. The first set of the conveyor is a 300 m conveyor, that discharges the material on the main haulage conveyor. Your task is to design the intermediate conveyor belt to achieve a production of 2500 tph. 71) RockMass Caving Process (2) Undercut Level Production Level (3) Intermediate Conveyor Level (4) 1. Read at least 3 articles where a conveyor belt was used in mining operation. This should help you determine which key information is needed for you to design the conveyor. Summarize the information from these articles in a chapter "Literature review 2. Constantly consult the lecturer through your design. Keep a record of those consultation in a logbook that must be submitted with the assignment 3. Provide a summary of the data you need to accomplish the design (from literature review) and what design procedures you are going to use. Name this chapter **Methodology" 4. All the design results should be under a chapter "Design Results and Analysis" 5. Yor report must have an introduction and conclusions chapters too. A technical report must be submitted on 16 May 2022.