Assignment 1: Belt Conveyor An underground copper block caving operation, shown in the diagram, is planning to use a bel
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
Assignment 1: Belt Conveyor An underground copper block caving operation, shown in the diagram, is planning to use a bel
Assignment 1: Belt Conveyor An underground copper block caving operation, shown in the diagram, is planning to use a belt conveyor as the primary mode of moving ore out of the mine. The first set of the conveyor is a 300 m conveyor, that discharges the material on the main haulage conveyor. Your task is to design the intermediate conveyor belt to achieve a production of 2500 tph. 71) RockMass Caving Process (2) Undercut Level Production Level (3) Intermediate Conveyor Level (4) 1. Read at least 3 articles where a conveyor belt was used in mining operation. This should help you determine which key information is needed for you to design the conveyor. Summarize the information from these articles in a chapter "Literature review 2. Constantly consult the lecturer through your design. Keep a record of those consultation in a logbook that must be submitted with the assignment 3. Provide a summary of the data you need to accomplish the design (from literature review) and what design procedures you are going to use. Name this chapter **Methodology" 4. All the design results should be under a chapter "Design Results and Analysis" 5. Yor report must have an introduction and conclusions chapters too. A technical report must be submitted on 16 May 2022.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!