A 18.20 19.63 22.18 23.78 24.22 B 18.05 19.05 21.77 23.12 23.75 C 17.68 18.83 21.32 21.76 22.50 D 17.42 18.65 19.53 19.9

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

A 18.20 19.63 22.18 23.78 24.22 B 18.05 19.05 21.77 23.12 23.75 C 17.68 18.83 21.32 21.76 22.50 D 17.42 18.65 19.53 19.9

Post by answerhappygod »

A 18 20 19 63 22 18 23 78 24 22 B 18 05 19 05 21 77 23 12 23 75 C 17 68 18 83 21 32 21 76 22 50 D 17 42 18 65 19 53 19 9 1
A 18 20 19 63 22 18 23 78 24 22 B 18 05 19 05 21 77 23 12 23 75 C 17 68 18 83 21 32 21 76 22 50 D 17 42 18 65 19 53 19 9 1 (38.75 KiB) Viewed 18 times
A 18 20 19 63 22 18 23 78 24 22 B 18 05 19 05 21 77 23 12 23 75 C 17 68 18 83 21 32 21 76 22 50 D 17 42 18 65 19 53 19 9 2
A 18 20 19 63 22 18 23 78 24 22 B 18 05 19 05 21 77 23 12 23 75 C 17 68 18 83 21 32 21 76 22 50 D 17 42 18 65 19 53 19 9 2 (14.24 KiB) Viewed 18 times
A 18.20 19.63 22.18 23.78 24.22 B 18.05 19.05 21.77 23.12 23.75 C 17.68 18.83 21.32 21.76 22.50 D 17.42 18.65 19.53 19.98 21.82 5000 E 17.23 18.56 19.44 (19.12 21.50 5000 Site Formation Layout Plan Reduce level is +20.5 mPD Notes: 1. All dimensions are in millimeters; 2. Grid size is 5.00m x 5.00m; 3. Reduce level is +20.5 mPD; 4. All excavated material is suitable for backfilling: 5. All surplus excavated material to be removed from site and deposited to TM38; 6. Apart from the excavated material, all filling material to be obtained from off-site area provided by the Contractor; and 7. All filling in marking up level (reduce level) to be deposited in 500mm layer by layer and compacted by vibrating roller
Q1 With reference to Drawing No.: CON4525/01, prepare a taking-off (25 marks) list and take off the quantities of cut and fill for the site formation in MH in accordance with HKSMM4 Rev. 2018. (Student must clearly mark both the Cut and Fill line and Give and Take line on the drawing of Question paper and submitted with the Answer Book.) Afterwards, produce the Bill of Quantities by direct billing method accordingly.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply