13. The following is a list of activity times for a project, as well as crashing costs for its activi- ties. Determine w
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
13. The following is a list of activity times for a project, as well as crashing costs for its activi- ties. Determine w
13. The following is a list of activity times for a project, as well as crashing costs for its activi- ties. Determine which activities should be crashed and the total cost of crashing if the goal is to shorten the project by three weeks as cheaply as possible. First construct a network diagram. You can use either an AOA or an AON (see Solved Problem 5). Path Activity Duration (weeks) First Crash Second Crash Top A 5 $8 $10 B 6 7 9 с 3 15 Middle D 3 9 11 14 < UUT LO MO 7 8 C F Bottom 3 5 5 5 14 10 11 12 9 15 15 13 14 G H