Flexible Budgets, Direct-Cost Variances, and Management Control Flexible Budget 2 Sweeney Enterprises manufactures tires

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Flexible Budgets, Direct-Cost Variances, and Management Control Flexible Budget 2 Sweeney Enterprises manufactures tires

Post by answerhappygod »

Flexible Budgets Direct Cost Variances And Management Control Flexible Budget 2 Sweeney Enterprises Manufactures Tires 1
Flexible Budgets Direct Cost Variances And Management Control Flexible Budget 2 Sweeney Enterprises Manufactures Tires 1 (73.32 KiB) Viewed 23 times
Flexible Budgets, Direct-Cost Variances, and Management Control Flexible Budget 2 Sweeney Enterprises manufactures tires for the Formulai motor racing circult. The company's budgeted and actual amounts are as follows: Budgeted for August 2017 Units to manufacture and sell 3,550 Variable cost per tire $72 Total fixed costs $54,500 0 Budgeted selling price per tire $115 1 Actual Results for August 2017 13 Units manufactured and sold 3,500 14 Selling price per tire $116 15 Total variable costs $280,000 16 Total fixed costs $51,000 17 18 Use the blue shaded areas for inputs. 19 Always use cell references and formulas where appropriate to receive full credit. 20 21 Requirement 22 Prepare a performance report that uses a flexible budget and a static budget. 23 Enter all amounts as positive values. Do NOT use parentheses or a minus sign for amounts to be subtracted. Use the ABS function when calculating variances, and use the drop down selections for F (favorable) or (unfavorable) when describing the variances. For variances with a zero amount, make sure to enter the result of "0" in the 25 appropriate cell and leave the drop-down to identify the varlance as either For U b. 24 C. 26 28 27 Prepare a performance report that uses a flexible budget and a static budget. a. Enter all amounts as positive values. Do NOT use parentheses or a minus sign for amounts to be subtracted. b. Use the ABS function when calculating variances, and use the drop down selections for F 29 (favorable) or (unfavorable) when describing the variances. c. For variances with a zero amount, make sure to enter the result of - in the appropriate cell and 30 leave the drop-down to identify the variance as either For U blank. (Always use cell references and formulas where appropriate to receive full credit. If you copy/paste 31 from the Instruction tab you will be marked wrong.) 32 Actual Results Flexible-Budget Variance Flexible Budget Sales-Volume Variances Static Budget *Variances should be presente 23 34 Units sold 35 Revenues 36 Variable costs 37 Contribution margin 38 Fixed costs 29 Operating income 41
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply