1. An intersection is designed to operate under a three-phase signal timing plan. This includes a leading protected left

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

1. An intersection is designed to operate under a three-phase signal timing plan. This includes a leading protected left

Post by answerhappygod »

1 An Intersection Is Designed To Operate Under A Three Phase Signal Timing Plan This Includes A Leading Protected Left 1
1 An Intersection Is Designed To Operate Under A Three Phase Signal Timing Plan This Includes A Leading Protected Left 1 (208.73 KiB) Viewed 32 times
1. An intersection is designed to operate under a three-phase signal timing plan. This includes a leading protected left-turn phase for the major road, followed by a phase that serves through- and right-turn movements on the major road. Subsequently, all movements are served simultaneously on the minor road. Each approach has a 40-mph speed limit and the intersection is 36 ft wide in both directions. Turning movements are as detailed in the diagram below and empirical data suggest a start-up lost time of 2 s and a 2 s extension of the effective green for each phase. Field data suggest a saturation flow rate of 1800 yeh/h/ln for the through/right-turn movements, 1500 veh/hr/ln for the left/through/right-turn movements, and 1200 veh/h/ln for the left-turn movements. Given this information: a. Calculate the duration of the yellow change interval, rounding to the nearest second. (4 points) b. Calculate the duration of the all-red clearance interval, rounding to the nearest second. (4 points) c. Determine the minimum feasible cycle length using the Highway Capacity Manual method (i.e., set X = 1.0) (6 points) d. Determine the optimal cycle length using the Webster method. (6 points) 300 N vph 600 vph 120 vph 150 vph 675 vph- 375 vph
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply