The model J wagon is to be assembled on a conveyor belt. 360 wagons are required per day. Production time per day is 450

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

The model J wagon is to be assembled on a conveyor belt. 360 wagons are required per day. Production time per day is 450

Post by answerhappygod »

The Model J Wagon Is To Be Assembled On A Conveyor Belt 360 Wagons Are Required Per Day Production Time Per Day Is 450 1
The Model J Wagon Is To Be Assembled On A Conveyor Belt 360 Wagons Are Required Per Day Production Time Per Day Is 450 1 (57.46 KiB) Viewed 41 times
The model J wagon is to be assembled on a conveyor belt. 360 wagons are required per day. Production time per day is 450 minutes, and the assembly steps and times for the wagon are given. Find the balance that minimizes the number of workstations, subject to cycle time and precedence constraints. Our primary rule is to prioritize tasks in order of the largest number of following tasks. And secondary rule is to prioritize tasks in order of longest task time Task Task time(seconds) Task that must precede A 30 B 35 A C 30 A D 35 B E 14 с F 65 C G 40 E, F Н 25 D, G A. Draw a precedence diagram. B. Find the cycle time and theoretically required minimum number of workstation. C. Balance the line (Assign tasks into workstations). D. Find the efficiency rate of this balancing. UH