Your MRP run detects a shortage of 2000 pieces for a material with an active quota arrangement. Each of your two supplie

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Your MRP run detects a shortage of 2000 pieces for a material with an active quota arrangement. Each of your two supplie

Post by answerhappygod »

Your MRP run detects a shortage of 2000 pieces for a material with an active quota arrangement. Each of your two suppliers can only supply 1000 pieces at once.
What must you maintain to have MRP generate a procurement proposal for 1000 pieces for each supplier? (Choose two.)

A. Set a maximum quota quantity in the quota arrangement item for each supplier.
B. Assign a rounding profile in the material master record of the planned material.
C. Set a maximum lot size in the quota arrangement item and activate the 1x checkbox.
D. Assign the indicator for quota splitting to the lot-sizing procedure being used.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply