Which two statements about transparent bridging operations are true? (Choose two.)

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

Which two statements about transparent bridging operations are true? (Choose two.)

Post by answerhappygod »

Which two statements about transparent bridging operations are true? (Choose two.)

A. A bridge builds its MAC address table dynamically using the spanning-tree protocol.
B. A bridge operates at the data link layer.
C. A bridge sends unknown unicast frames out on all ports except the incoming port.
D. A bridge forwards traffic based on the destination IP address.
E. All the ports on the bridge belong to the same collision domain.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!

This topic has 1 reply

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply