Figure Q3(b) (b) You are one of the NDT engineering team in Sapura Energy Berhad that have been asked to perform visual
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
Figure Q3(b) (b) You are one of the NDT engineering team in Sapura Energy Berhad that have been asked to perform visual
Figure Q3(b) (b) You are one of the NDT engineering team in Sapura Energy Berhad that have been asked to perform visual inspection on pressure vessel as shown in Figure Q3(b). Draft a Visual Testing (VT) report based on BS EN ISO 17637-2011 and SNT-TC-1A, 2011. The draft report should include six (6) criteria as below; (i) How visual examination is to be performed (ii) Type of surface conditions available (iii) Method or tools for surface preparation, if any (iv) Whether direct or remote viewing is used (v) Special illumination, instruments, or equipment to be used, if any (vi) Report forms to be completed
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!