A 10,000-ft drillstring composes of a 9,000ft long pipe (ID=3” and OD=4.5”, drill collar ID=2” and OD=6”). Steel density

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

A 10,000-ft drillstring composes of a 9,000ft long pipe (ID=3” and OD=4.5”, drill collar ID=2” and OD=6”). Steel density

Post by answerhappygod »

A 10,000-ft drillstring composes of a 9,000ft long pipe (ID=3”
and OD=4.5”, drill collar ID=2” and OD=6”). Steel density is 65
ppg. For a vertical borehole, a 10 ppg water-based mud was used to
drilling the borehole. What is the axial stress in the drillpipe at
8000ft?. Assume WOB is 30,000lbf.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!
Post Reply