In a place, before the construction, CPT test was applied, the sand CPT Data is presented in Table 1. Ground water level

Business, Finance, Economics, Accounting, Operations Management, Computer Science, Electrical Engineering, Mechanical Engineering, Civil Engineering, Chemical Engineering, Algebra, Precalculus, Statistics and Probabilty, Advanced Math, Physics, Chemistry, Biology, Nursing, Psychology, Certifications, Tests, Prep, and more.
Post Reply
answerhappygod
Site Admin
Posts: 899604
Joined: Mon Aug 02, 2021 8:13 am

In a place, before the construction, CPT test was applied, the sand CPT Data is presented in Table 1. Ground water level

Post by answerhappygod »

In a place, before the construction, CPT test was applied, the
sand CPT Data is presented in Table 1. Ground water level of the
region is at the 1-meter depth. You may Take 𝛾=18 π‘˜π‘/π‘š3 π›Ύπ‘ π‘Žπ‘‘=20
π‘˜π‘/π‘š3 π›Ύπ‘€π‘Žπ‘‘π‘’π‘Ÿ =10 π‘˜π‘/π‘š3
In A Place Before The Construction Cpt Test Was Applied The Sand Cpt Data Is Presented In Table 1 Ground Water Level 1
In A Place Before The Construction Cpt Test Was Applied The Sand Cpt Data Is Presented In Table 1 Ground Water Level 1 (23.12 KiB) Viewed 26 times
π‘žπ‘›π‘’π‘‘Μ…Μ…Μ…Μ…Μ…=160π‘˜π‘/π‘š2 , calculate the settlement of the square
foundation with B=3m (and L=3m) and Df=1m, using the Schmertmann
method in t = 4 years.
E = 2.5* qc
Table 1. CPT Data Depth (m) 4c (MPa) 0-2 4. 2-4 5 4-6 6 6- 8 7 8-10 8 10- 12 9