- • The soil is clay = 3000 lb / bcy • The earth haul road will be well maintained → RR = 80 lb / ton= 4 %. • Assume ave
-
answerhappygod
- Site Admin
- Posts: 899604
- Joined: Mon Aug 02, 2021 8:13 am
- • The soil is clay = 3000 lb / bcy • The earth haul road will be well maintained → RR = 80 lb / ton= 4 %. • Assume ave
- • The soil is clay = 3000 lb / bcy • The earth haul road will be well maintained → RR = 80 lb / ton= 4 %. • Assume average load time 0.85 minute. (fixed time) • From load - growth curve, the expected load will be 96 % of heaped capacity. • 50 min. / hr in used.
Join a community of subject matter experts. Register for FREE to view solutions, replies, and use search function. Request answer by replying!